{"id":24193,"date":"2020-07-27T17:00:00","date_gmt":"2020-07-27T20:00:00","guid":{"rendered":"https:\/\/cajamar.sp.gov.br\/noticias\/?p=24193"},"modified":"2020-07-27T18:04:53","modified_gmt":"2020-07-27T21:04:53","slug":"muro-de-contencao-do-bairro-santa-terezinha-esta-em-fase-final","status":"publish","type":"post","link":"https:\/\/cajamar.sp.gov.br\/noticias\/2020\/07\/27\/muro-de-contencao-do-bairro-santa-terezinha-esta-em-fase-final\/","title":{"rendered":"Muro de conten\u00e7\u00e3o do bairro Santa Terezinha est\u00e1 em fase final"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1080\" height=\"597\" src=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-162749_trello.jpg\" alt=\"\" class=\"wp-image-24194\" srcset=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-162749_trello.jpg 1080w, https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-162749_trello-768x425.jpg 768w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><figcaption>Para refor\u00e7ar a seguran\u00e7a da \u00e1rea atingida, foram constru\u00eddos dois muros de gabi\u00e3o com estruturas feitas em a\u00e7o. Foto: Secretaria Municipal de Moderniza\u00e7\u00e3o e Comunica\u00e7\u00e3o.<\/figcaption><\/figure>\n\n\n\n<p>As obras de recomposi\u00e7\u00e3o da Rua Eldorado, no bairro Santa Terezinha, em Jordan\u00e9sia, j\u00e1 est\u00e3o em fase conclusiva. Desde o in\u00edcio de maio, a Secretaria de Infraestrutura e Servi\u00e7os P\u00fablicos est\u00e1 executando a constru\u00e7\u00e3o de dois muros de conten\u00e7\u00e3o em um trecho da rua que est\u00e1 interditado h\u00e1 cerca de quatro anos.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1080\" height=\"719\" src=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-162837_trello.jpg\" alt=\"\" class=\"wp-image-24195\" srcset=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-162837_trello.jpg 1080w, https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-162837_trello-768x511.jpg 768w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><figcaption>Nos pr\u00f3ximos dias ser\u00e1 realizada a etapa final da obra, com a instala\u00e7\u00e3o da rede de drenagem para controlar a vaz\u00e3o das \u00e1guas de chuva.<\/figcaption><\/figure>\n\n\n\n<p>Os moradores do bairro reivindicam melhorias para o local desde 2005, por estar apresentando riscos, e em 2016 um temporal ocasionou o deslizamento de parte da rua, deixando v\u00e1rias casas interditadas, prejudicando muitas fam\u00edlias.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1072\" height=\"602\" src=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163010_trello.jpg\" alt=\"\" class=\"wp-image-24196\" srcset=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163010_trello.jpg 1072w, https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163010_trello-768x431.jpg 768w\" sizes=\"(max-width: 1072px) 100vw, 1072px\" \/><figcaption>As equipes est\u00e3o finalizando a constru\u00e7\u00e3o dos muros e tamb\u00e9m est\u00e1 sendo feito o plantio de grama.<\/figcaption><\/figure>\n\n\n\n<p>Para refor\u00e7ar a seguran\u00e7a da \u00e1rea atingida, foram constru\u00eddos dois muros de gabi\u00e3o com estruturas feitas em a\u00e7o, que ir\u00e3o garantir a estabilidade das encostas e taludes do local. As equipes est\u00e3o finalizando a constru\u00e7\u00e3o dos muros e executando o retaludamento, com o acerto da superf\u00edcie que fica acima dos muros e tamb\u00e9m est\u00e1 sendo feito o plantio de grama.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"724\" src=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163103_trello.jpg\" alt=\"\" class=\"wp-image-24197\" srcset=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163103_trello.jpg 1080w, https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163103_trello-768x515.jpg 768w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><figcaption>Os moradores do bairro reivindicam melhorias para o local desde 2005.<\/figcaption><\/figure>\n\n\n\n<p>Nos pr\u00f3ximos dias ser\u00e1 realizada a etapa final da obra, com a instala\u00e7\u00e3o da rede de drenagem para controlar a vaz\u00e3o das \u00e1guas de chuva, evitando as inunda\u00e7\u00f5es, beneficiando o escoamento de \u00e1gua para impedir novos deslizamento e eros\u00f5es.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1079\" height=\"613\" src=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163150_trello.jpg\" alt=\"\" data-id=\"24198\" data-link=\"https:\/\/cajamar.sp.gov.br\/noticias\/?attachment_id=24198\" class=\"wp-image-24198\" srcset=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163150_trello.jpg 1079w, https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163150_trello-768x436.jpg 768w\" sizes=\"(max-width: 1079px) 100vw, 1079px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"720\" src=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163209_trello.jpg\" alt=\"\" data-id=\"24199\" data-full-url=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163209_trello.jpg\" data-link=\"https:\/\/cajamar.sp.gov.br\/noticias\/?attachment_id=24199\" class=\"wp-image-24199\" srcset=\"https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163209_trello.jpg 1080w, https:\/\/cajamar.sp.gov.br\/noticias\/wp-content\/uploads\/sites\/2\/2020\/07\/screenshot_20200727-163209_trello-768x512.jpg 768w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure><\/li><\/ul><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>A obra foi realizada para recompor parte da rua que est\u00e1 interditada desde 2016, ap\u00f3s um deslizamento. Foram constru\u00eddos dois muros de gabi\u00e3o, para refor\u00e7ar a seguran\u00e7a da \u00e1rea atingida e impedir novos deslizamento e eros\u00f5es.<\/p>\n","protected":false},"author":12,"featured_media":24194,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15,14],"tags":[],"posicao":[28],"class_list":["post-24193","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infraestrutura","category-servicos-publicos","posicao-destaque"],"_links":{"self":[{"href":"https:\/\/cajamar.sp.gov.br\/noticias\/wp-json\/wp\/v2\/posts\/24193","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cajamar.sp.gov.br\/noticias\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cajamar.sp.gov.br\/noticias\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cajamar.sp.gov.br\/noticias\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/cajamar.sp.gov.br\/noticias\/wp-json\/wp\/v2\/comments?post=24193"}],"version-history":[{"count":2,"href":"https:\/\/cajamar.sp.gov.br\/noticias\/wp-json\/wp\/v2\/posts\/24193\/revisions"}],"predecessor-version":[{"id":24202,"href":"https:\/\/cajamar.sp.gov.br\/noticias\/wp-json\/wp\/v2\/posts\/24193\/revisions\/24202"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cajamar.sp.gov.br\/noticias\/wp-json\/wp\/v2\/media\/24194"}],"wp:attachment":[{"href":"https:\/\/cajamar.sp.gov.br\/noticias\/wp-json\/wp\/v2\/media?parent=24193"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cajamar.sp.gov.br\/noticias\/wp-json\/wp\/v2\/categories?post=24193"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cajamar.sp.gov.br\/noticias\/wp-json\/wp\/v2\/tags?post=24193"},{"taxonomy":"posicao","embeddable":true,"href":"https:\/\/cajamar.sp.gov.br\/noticias\/wp-json\/wp\/v2\/posicao?post=24193"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}